At approximately 11:47AM the SSL accelerator that services Ryerson WebMail had a problem with it’s dual network interfaces. The links between the data centre switches were flooded , resulting in intermittent connectivity to various core applications.
One of the network interfaces on the SSL accelerator was shut down at 12:52PM, resolving the intermittent connectivity issue.
The cause for the flooding is under investigation.